Set-up of a CO2 trans-critical power station with a total cooling capacity of 750 KW . We are proud that this is the first industrial facility to incorporate the new Danfoss liquid ejectors, which, combined with the new Danfoss CALM system, enables us to ensure optimum facility performance..
All installation has been entirely carried out by our company Frimorife with no subcontracting; drains, electricity, refrigeration installation, safety systems, approved temperature recorders, etc. We perform turnkey installations.
This is undoubtedly an innovative system and a leader in the field of industrial refrigeration, both nationally and internationally..